²ÝÝ®ÊÓƵAPP

Return
Location:
Maine
Completed:
2018

Paper Machine Rebuild

Scope of Work
²ÝÝ®ÊÓƵAPP completed a paper machine rebuild during a 55-day outage. The piping scope of work included installing large and small bore piping for steam, air, glycol, hydraulic, and pulper. The electrical scope included installing cable, cable trays, conduit, and performing terminations for new machine drives, winder and reel sections, and dryer sections. The mechanical scope included installing new finishing and shipping equipment and performing associated electrical work. 
Project Details
  • Installed 132,000 linear feet of cable
  • Installed 52,000 linear feet of conduit and cable tray
  • Performed 75 electrical terminations
  • Set and installed 75 pieces of equipment
  • Fabricated over 5,000 small and large bore welds
  • Installed approximately 1,000 bolt ups
  • Installed approximately 1,300 piping supports
  • Assisted with the equipment and material coordination at an off-site warehouse
Lean, Innovative and Unique Project Solutions

²ÝÝ®ÊÓƵAPP was required to develop a detailed, interactive log that tracked extra work items for piping and electrical.

No items found.

Our Offices
Corporate Headquarters
P.O. Box 1000
Pittsfield, ME 04967
207-487-3311
info@cianbro.com

Email Us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.