Sutton, MA
Completed:
2016

Sutton Bridge Railroad Replacement

Scope of Work
²ÝÝ®ÊÓƵAPP was contracted by Providence & Worcester (P&W) Railroad to demolish and replace a 100-foot long bridge along the active freight line connecting Providence and Worcester. This project was completed in two phases, beginning in December of 2015.
Project Details
  • Installed a sheet wall on either side of the existing abutments in order to support the cranes needed to replace the bridge
  • Installed soil anchors for the sheet walls
  • Demolished and replaced the existing bridge
Lean, Innovative and Unique Project Solutions
During both phases, ²ÝÝ®ÊÓƵAPP was challenged with completing the work while still keeping the tracks live. The tracks were to remain live at all times during weekdays, which gave ²ÝÝ®ÊÓƵAPP limited time to shut down the rails. The railroad closed for two consecutive 72-hour weekend periods during the sheet wall installation and one 72-hour period during the complete bridge replacement. The full commitment and participation of the team ensured the project was completed safely, on time, and resulted in both a very satisfied client and a quality product.
No items found.

Our Offices
Corporate Headquarters
P.O. Box 1000
Pittsfield, ME 04967
207-487-3311
info@cianbro.com

Email Us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.